4+ Years of Experience
4+ years of perfection in every project.
50+ Global Branches
With a presence in 50+ global locations.
Lumber waste can quickly increase construction costs and reduce profitability. Incorrect ordering often happens because of rushed calculations or incomplete lumber takeoffs. Accurate quantity planning helps you avoid delays, reduce waste, and maintain smooth construction progress.
COMET Estimating prepares detailed lumber takeoffs for residential, commercial, and renovation projects across Canada. We calculate lumber quantities based on sizes, grades, spacing, and usage areas. Our takeoffs help contractors order the right materials, improve installation planning, and control project costs with confidence.
+
Delivered
+
Projects
+
Clients
+
Experience
Lumber quantities directly affect construction schedules, ordering efficiency, and overall project costs. Even small takeoff mistakes can create delays, increase waste, and reduce profit margins. Accurate lumber takeoffs help you plan construction work with better control and confidence.
Whether you handle a few projects or many, our estimating support grows with your business.
4.9 Business Rating
Best Rating in your town in estimating business
We estimate lumber quantities for beams, joists, studs, headers, and structural framing systems. Accurate framing takeoffs help support safe and efficient construction planning.
Roof framing requires detailed material calculations and layout planning. We estimate rafters, trusses, roof supports, and related framing components based on project drawings.
Wall framing systems involve multiple lumber sizes and spacing layouts. Our takeoffs provide accurate quantities for interior and exterior wall construction.
We estimate lumber required for floor joists, rim boards, and structural floor supports. Accurate planning helps improve installation efficiency and material control.
Our takeoffs include plywood, OSB panels, and related sheathing materials where required. We calculate quantities carefully to support structural stability and proper installation.
Renovation and addition projects require careful review of existing structures. We estimate replacement and additional lumber quantities to support accurate material ordering and planning.
Our Clients Include
01
Send us your framing plans, sections, specifications, and project details for review. You can also include information about lumber grades, sizes, and construction scope to improve estimating accuracy.
02
Our estimators review your project drawings and prepare an initial lumber takeoff. We calculate framing quantities, wood components, and related materials required for construction.
03
You review the takeoff and share feedback with our estimating team. If revisions or updates are required, we adjust the quantities to match your final project requirements.
04
After this, we provide a comprehensive and structured lumber takeoff to procure, price, budget, and plan constructions.
We calculate lumber quantities directly from project drawings and specifications. This helps improve ordering accuracy and reduce construction delays.
Precise lumber takeoffs help reduce unnecessary material waste on site. Better quantity planning supports stronger budget control and project efficiency.
We carefully consider lumber sizes, grades, spacing, and usage locations in every estimate. This ensures compliance with project requirements and construction standards.
Lumber shortages and overordering can increase costs and slow down construction progress. COMET Estimating provides accurate lumber takeoffs based on project drawings and specifications. Our detailed quantity estimates help you reduce waste, improve ordering accuracy, and maintain smooth construction flow from the beginning.



What Goes Wrong With Bad Lumber Takeoffs
01
Incorrect quantities can stop framing and construction activities during the project. Work slows down when the required lumber materials are not available on time.
02
Overordering lumber increases storage costs and creates unnecessary material waste. This reduces budget efficiency and affects overall project profitability.
03
Inaccurate lumber takeoffs can delay framing installation and related construction activities. Delays in one stage often affect the entire project schedule.
04
Incorrect orders disrupt supplier coordination and delivery planning. This creates scheduling problems and affects site operations.
05
Wrong lumber sizing or quantity calculations can affect framing accuracy during installation. Additional adjustments may create delays and increase labour costs.
06
Takeoff mistakes often increase material expenses and create avoidable rework. This affects profit margins and overall project performance.
+
Quotes
Delivered
+
Completed
Projects
+
Commercial
Clients
+
Years
of Experience
COMET Estimating offers the precise lumber takeoffs which assist in the effective planning of construction in Canada. We have experience in residential framing, commercial construction and renovation projects of various sizes and scope.
Wrong lumber quantities may affect the costs of the project and build timetables. COMET Estimating offers precise lumber takeoffs to allow you to minimize waste, enhance the accuracy of order quantities, and ensure a continuous flow of construction in Canada using drawings and specifications.
224 Gilmour Ave, Toronto, ON M6P 3B4, Canada
Monday - Friday
09:00 AM Until 05:00 PM